اعادة تصميم وتأهيل طريق زيف في مدينة يطا

dc.contributor.advisorقفيشة, مؤيد
dc.contributor.authorحراحشة, محمد
dc.contributor.authorحساسنة, مؤيد
dc.contributor.authorبحيص, ادهم
dc.date.accessioned2024-06-26T07:14:36Z
dc.date.available2024-06-26T07:14:36Z
dc.date.issued2024-05-01
dc.descriptionCD, no of pages 121, هندسة مساحة 3/2024
dc.description.abstractRoad networks are vital infrastructures that aid the nation's flourishing and development. However, many main roads in Palestine suffer from a lack of suitable structural and geometrical design. In This project, we aim to design and rehabilitate the road called (Zeif Road), which links the city of Yatta with Street 60 and is considered the main city entrance to the city of Yatta from the northern side. It also constitutes a solution to the traffic jam existing in the center of the town. Because the road also joins the city of Yatta to the city of Hebron and neighboring villages. In this project, all survey applications necessary for road projects will be made, in addition to designing road engineering and construction in terms of the establishing of retaining walls and others and finding solutions to rainwater drainage problems, taking into account the security and safety rules from several perspectives including road users, pedestrians, and vehiclesen_US
dc.identifier.urischolar.ppu.edu/handle/123456789/9081
dc.language.isoaren_US
dc.publisherجامعة بوليتكنك فلسطين - مساحةen_US
dc.subjectالطرق - اعادة تأهيلen_US
dc.titleاعادة تصميم وتأهيل طريق زيف في مدينة يطاen_US
dc.typeOtheren_US

Files

Original bundle

Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
اعادة تصميم وتأهيل طريق زيف في مدينة يطا.pdf
Size:
7.36 MB
Format:
Adobe Portable Document Format
Description:
Loading...
Thumbnail Image
Name:
مخططات المشروع النهائي (4).pdf
Size:
33.99 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: