Development of a BIM-based technique for modeling construction waste in the design and early planning phase of construction waste management (Case study: Tartous housing projects - Syria)

dc.contributor.authorAli, Hassan
dc.contributor.authorShaban, Mohamed
dc.date.accessioned2026-01-07T00:47:08Z
dc.date.available2026-01-07T00:47:08Z
dc.date.issued2025-09-29
dc.descriptionNumber of pages: 1, 2025 Engineering for Palestine Conference (ENG4PAL) PPU, Hebron, Palestine, September 29-30, 2025en_US
dc.description.abstractconstruction waste is a major problem in the construction industry, as it causes environmental issues and resource depletion. Building Information Modeling (BIM) has emerged as a potential solution to address the challenges associated with construction waste. BIM allows virtual modeling of construction projects, enabling optimization of materials and resources. This research aims to study a practical approach to construction waste modeling using BIM and its potential impact on reducing waste generation in the construction industry. Housing projects in Tartous, Syria, were selected as a case study. In this paper, we present a BIM-based methodology during the design phase, through which construction waste is modeled for 20 building elements or items, such as concrete, walls, floor tiles, wall ceramics, etc. Quantitative and qualitative data were obtained for the waste related to the project’s time plan. The new model also provided the possibility of reducing the project implementation time by up to 6.28% and reducing the cost by up to 3.85%, which demonstrates great potential for construction waste management strategies and ways to manage and benefit from waste during the project implementation period. The availability of both quantitative and qualitative waste data enables early planning for construction waste management by linking BIM to the project implementation plan, which contributes to improving sustainability standards by preserving resources and reducing waste.en_US
dc.identifier.urischolar.ppu.edu/handle/123456789/9367
dc.language.isoenen_US
dc.publisherPalestine Polytechnic Universityen_US
dc.subjectBIM-based, modeling construction waste, design, early planning phase, construction waste management, Case study, Tartous housing projects, Syriaen_US
dc.titleDevelopment of a BIM-based technique for modeling construction waste in the design and early planning phase of construction waste management (Case study: Tartous housing projects - Syria)en_US
dc.title.alternativeManagement dept., Civil Engineering Faculty, Homs University, Syria, Homs, Syrian Arab Republicen_US
dc.typeWorking Paperen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
CAbstractsReporstProjects_58.pdf
Size:
329.34 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: