Design PV substation and study its impact on both side (33k and 11k) of 10 MVA station

dc.contributor.advisorIqteit, Nassim
dc.contributor.authorGhaith, Ayman
dc.contributor.authorSalah, Amin
dc.contributor.authorBitar, Shams Addin
dc.date.accessioned2022-08-07T07:58:21Z
dc.date.available2022-08-07T07:58:21Z
dc.date.issued2022-06-01
dc.descriptionCD, no of pages 72, طاقة 1/2022
dc.description.abstractThe Evaluation and improvement of electric substations, feeders and distribution network performance in the electrical systems leads to increased reliability in the service; it also leads to high financial return that encourages investment in this field. Studies show that 30% to 40% of the investment in the electricity sector is spent on substation distribution system. This project will work on analyzing and evaluate the Beit Hanina substation (10 MW, 33/11 kV) from different sides; Station capacity, old cables, power factor, load distribution. On the other hand, in order to build a solar power plant and connect it to a level of 33 kV or 11 kV, the Homer Pro program was used to collect information about the total number of panels, the method of their connection, the capacity of each panel, the total capacity, as well as information about the inverter in terms of the internal voltageand the external effort, efficiency, as well as the cables connecting betweenthe panels and the inverter and between the inverter and the main bass line.Homer program was also used to obtain the rate of solar radiation and the rate of heat in the spatial scale of Beit Hanina. Based on all the information obtained through the programs, a new 2 MW solar power plant was belt which is separated to two main stations withen_US
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/8715
dc.language.isoenen_US
dc.publisherجامعة بوليتكنك فلسطين - طاقةen_US
dc.subjectPV substationen_US
dc.titleDesign PV substation and study its impact on both side (33k and 11k) of 10 MVA stationen_US
dc.typeOtheren_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Design PV substation and study its impact on both side (33k and 11k) of 10 MVA station.pdf
Size:
3.2 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: