Filling and Packaging Machine of Solid Materials: Design and Operation

Loading...
Thumbnail Image

Journal Title

Journal ISSN

Volume Title

Publisher

جامعة بوليتكنك فلسطين - اتمتة صناعية

Abstract

After we finished the idea of the machine, we start to buy the metal and all materials that needed for project. The first work is turning the iron places, roll boxes and its columns, after that we start to do the bodywork of the machine, the cone and the screw. Then accumulating all parts on the body. At the finishing of mechanical stage we Calibrate all part of all operations. Then we drift to electrical stage, at this stage we assembly the electrical board with all components, and programming the PLC controller to control all operations. After that we examine and calibrate steps with final works. All stages of machine work probably; from pulling the roll, filling and ironing stage.

Description

no of pages 83, 23739, اتمتة صناعية 1/2008 , in the store

Citation

Endorsement

Review

Supplemented By

Referenced By