DSpace Repository

An Experience in Preparing Rehabilitation and Design Plans: The Case of Seventy Road, Jenin, Palestine

Show simple item record

dc.contributor.author Ashqar, Osaid
dc.contributor.author Abu Salah, Mahmud
dc.contributor.author Yasin, Mohammad
dc.contributor.author Aburajab, Nidal
dc.date.accessioned 2026-01-06T23:24:50Z
dc.date.available 2026-01-06T23:24:50Z
dc.date.issued 2520-09-29
dc.identifier.uri scholar.ppu.edu/handle/123456789/9355
dc.description Number of pages: 1, 2025 Engineering for Palestine Conference (ENG4PAL) PPU, Hebron, Palestine, September 29-30, 2025 en_US
dc.description.abstract The project involves of the design and rehabilitating of the road connecting Almania circle with the bypass road (Seventy Road) which falls under the jurisdiction of the Jenin Municipality “Jenin / Westbank / Palestine”. The total length of the road is 1,400 meters, and it will be designed with a width of 17 meters. This road holds significant importance as a vital commercial route in the region, serving a large number of residents both within the city and across the governorate. The project scope includes all necessary surveying works, traffic count, the engineering and construction design of the road, and related requirements such as quantity calculations (cut and fill), rainwater drainage systems, and adherence to safety and security standards for all road users, including pedestrians and vehicles. en_US
dc.language.iso en en_US
dc.publisher sityPalestine Polytechnic University en_US
dc.subject Experience, Preparing, Rehabilitation, Design, Plans, Case, Seventy, Road, Jenin, Palestine en_US
dc.title An Experience in Preparing Rehabilitation and Design Plans: The Case of Seventy Road, Jenin, Palestine en_US
dc.type Working Paper en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account