Abstract:
This project aims to design the road which links the school discharge pipe water and the
discharge pipe water to Al Karama, in the town of Samoua within the boundaries of the
structural plan, with a length of approximately 1300 meters and a width of 14 meters in
addition to a central island and two lines with the required traffic lights at a speed of 60
km / h.
The importance of this road is that it is an arterial and vital road, linking a main and
secondary road and there is no alternative, serving many agricultural plots in the area and
many buildings, and will be a source of attraction for urban expansion and alleviate the
pressure inherent in the town
The design of the project will include the implementation of the work space required for
road projects in addition to the design of the road engineering and construction, as well as
the requirements of road design and drainage of rain water taking into account the rules
of safety and security for road users of pedestrians and vehicles