Abstract:
The idea of this project is summarized in the structural design of the Hebron Youth Sports Club,
because of the importance of the structural design, as it is one of the most important stages that the
building is going through, in which the locations of the columns and structural systems for the
various elements of the building are determined, thus transforming the initial architectural plans
into executable plans,The project aims to make a structural design for all the structural elements
contained in the project, such as knots, bridges, columns, foundations, walls and other structural
elements. Where the project consists of four floors, with a total area of 6045 square meters, on a
plot of 5170 square meters in several different levels, located in the city of Hebron in the Abu
Rumman area.
The project consists of several stages represented in the beginning of the architectural scrutiny of
the plans, and the various structural elements of columns, bridges and knots have been selected in
a way that does not contradict the architectural requirements of the project.
After that, it goes through the structural design stage of the structural elements with the help of
some structural design programs such as: (BEAMD), (Safe) (Etabs2016) and presenting its results
in the form of executive plans. It is worth mentioning that the Jordanian code was used to
determine the live loads, as for the structural analysis and design The sections were used American
code (ACI_318_14).