The main objective of the project is to rehabilitate and design Wad Aziz Road in the
city of Hebron, which is a secondary road that connects with the main Abu Katila
Street and Farsh Al-Hawa Street, which is a road that connects with residential
complexes and many schools and serves many residents. The length of the road is
1156 meters.
The project will include the design of the infrastructure, the rainwater drainage
system, the design of vertical and horizontal curves, and the development of an
appropriate transportation and traffic system based on engineering specifications
and standards.
We also want to create a good system for the drainage of surface water from the
right-of-way by making side channels and transverse slopes, as well as placing
ferries in the appropriate places |