Abstract:
The project is established on the idea of creating and developing an application of
project scheduling and chart analysis. The main objective of this project is to design
an interface that performs time scheduling with some features such as project
network, critical path, and chart analysis, in terms of time, cost, and recourses
(Human resources, material resources).When any of these features change, the chart
dramatically produces the side effect of this change. This makes the project viable and
practical at any time through the duration of the project. This project is considered a
vital since it takes the previous related studies into consideration. finally the project
achieve the following objectives :
1. In perfect way project manager can list all activities and detail of activities(
Activity name, duration, cost, Est, Eet), that may face in the project.
2. Project manager can determine the dependencies between activities.
3. the system show activity on node(Network]), and determine critical path on the
draw screen.
4. project manager in easier way can add, delete, update any activity.
the user can watch AON, CPM
Description:
no of pages 66, 24822, تكنولوجيا المعلومات 13/2010 , in the store