Abstract:
This project works to study the street of peace between the present and the future through the
work of analysis of part of The Street of Peace located between Wadi Al-Tuffah Street and Justice
Street, where Al Salam Street is considered a major arterial street in Hebron, and the presence of
two consecutive traffic signs constitutes a suffocating traffic crisis in peak hours, and this crisis
leads to an increase in the number of accidents, and increase the time of the journey, leading to
delays of the traveler, and increased fuel consumption. The aim of this project is to achieve safety,
comfort, security, the development of the city's infrastructure and timely access for both drivers
and pedestrians, and the project works on traffic analysis of the two intersections on the synchro
program and shows that the level of service is at its worst (Err). Therefore, we have worked on
innovative current and future ways to solve the traffic problem, including the current phase of
`
XII
redesigning Peace Street, constructing roads parallel to Peace Street using infraworks, using
artificial intelligence technology and restricting the movement of heavy cars, while the future
situation we have designed a sophisticated method that includes architectural design of tunnels
and bridges on the lift program (sketch up), construction design of the tunnel manually and using
the programs (Atir) and (QRW).
Keywords: - Peace Street, Traffic Congestion, Bridges, Tunnels, Artificial Intelligence, Parallel Roads,
Synchro