Abstract:
The main idea of this project is to prepare all structural design and construction details for two components of a training center in Hebron city. Which are:
• A festival hall and class rooms span exceeds 20m.
• A workshop with spans longer than 40m.
This project consists of two buildings of one floor and it contains all activities required for any person.
This building is a reinforced concrete structure , and it was designed according to the ACI-318-08 , Jordanian cod and Indian cod.
The project contains the structural analysis for vertical and horizontal loads and the structural design and for each member in the project.
Description:
no of pages 163, 28245 , مباني 43/2014, in the store