Abstract:
This project aims to solve a problem in al-Herbawi factory represented in the line of
production which causes delay on the manufacturing process . The problem is that
all the mattress manufacturing process are automatically done expect of the label
adhesive tape one . We solved this problem by designing and building a system that
simulates the work of the worker with high accurate taping process and faster
response . This project has integrated mechanical , electrical and hydraulic systems
to achieve the optimal design . We built this project by our knowledge in over all
engineering which ended by solving the problem and getting the required output we
planned to get . This project also made the all mattress manufacturing stages full
automatic and with acceptable accuracy and faster response