Abstract:
Redesigning the road between Wad Al-Haria Street and Granada Street through
Al-Ekhwa Junction.
The chosen street is located in Hebron near Wadi Al-Haria, with a length of 950
meters and a structural width of 10 meters. The project aims to rehabilitate and
design this street because of the multiple problems such as the lack of safety and
security means for citizens who are using Pavements and footpaths of this street ,
the street nowadays has a lot of problems as asphalt cracking and multiple
problems .
This project will be implemented in several steps:
- Exploratory field visit to the street and inventory all the problems that exist and
must find solutions as possible.
- Surveying of the street.
- Engineering design for all parts of the road via lanes .curves , Pavements and
intersections .
- Structural design of the road, the design of pavements with correct dimensions
- Calculate the total cost of the project
یقع الشارع في الخلیل بالقرب من واد الهریة ,بطول 950 متر وعرض هیكلي 10 متر, ویهدف المشروع الى
اعادة تأهیل وتصمیم هذا الشارع لما یحتویه من مشاكل متعددة من عدم توافر وسائل السالمة واالمان للمواطنین
المستخدمین لهذا الشارع من ارصفه وممرات مشاه , ولما یحتویه الشارع الموجود حالیا ددة من ً مش مشاكل متع
تشقق االسفلت ومشاكل متعددة .
سیتم العمل على هذا المشروع بعدة خطوات وهي :
* الزیارة المیدانیة االستكشافیه للشارع وحصر جمیع المشاكل الموجودة والتي یجب ایجاد حلول لها ما امكن .
* الرفع المساحي للشارع .
* تصمیم الهندسي لجمیع اجزاء الطریق من حارات ومن حنیات وارصفة مشاه والتقاطعات الموجوده .
* التصمیم االنشائي للطریق , تصمیم الرصفات بابعاد صحیحة وسلیمة .
* حساب تكلفة المشروع الكلیه التقدیریه .