dc.description.abstract |
This project aims to design a step down subtransmission substation from 161 kV to 33 kV
of 500 MVA capacity. The substation design starts by deciding the substation location. After that
power transformers is selected, design a grounding system and protection system.
Before starting the design, a load forecasting must be fulfilled for the substation expected
loads to decide the substation capacity. This step must be done to guarantee the substation ability
to feed Hebron city with power for the both areas, the areas under the supervision of Hebron
Electric and power company (HEPCO) and those under the supervision of southern electric
company (SELCO) until the year 2040, based on substation capacity power transformers ratings
is considered, grounding system is designed and the required protection devices is selected.
The operation of entering power transformers to the utility is done on stages in order to
increase the substation capacity as the load increase. ETAP simulation program was used to
determine fault currents and to build the substation grounding grid.
يهدف هذا المشروع إلى تصميم محطة نقل كهربائية تعمل على خفض الجهد الكهربائي من 161 كيلو فولت إلى 33 كيلو فولت
و بسعة كهربائية تصل إلى 500 ميجا فولت أمبير.ويكون تصميم المحطة من خالل اختيار موقع المحطة بعد ذلك يتم اختيار
محوالت القدرة ، تصميم نظام التأريض للمحطة و أنظمة الحماية .
قبل البدء بتصميم المحطة الكهربائية , يجب عمل دراسة لتقدير األحمال التي سوف تغذيها, لضمان قدرة المحطة على تغذية
المنطقة الخاضعة لها كل من شركة كهرباء الخليل و شركة كهرباء جنوب الخليل حتى العام 2040م. و من أجل تحديد قدرة
المحوالت داخل المحطة ,و تصميم نظام التأريض, تصميم قضبان الوصل ,و اختيار أنظمة الحماية المناسبة.
تتم عملية إضافة محوالت القدرة تدريجيا وفق خطة تعتمد على النمو في األحمال مع الوقت. تم استخدام برنامج 'ETAP' من
من أجل تحديد تيار دائرة القَصر, و من أجل اعتماد و محاكاة نظام تأريض وفق المعاير العالمية. |