| dc.contributor.advisor | شبانه, فيضي | |
| dc.contributor.author | ابوعطوان, لؤي | |
| dc.contributor.author | السيد احمد, محمد | |
| dc.date.accessioned | 2019-03-14T10:41:05Z | |
| dc.date.accessioned | 2022-05-22T06:40:13Z | |
| dc.date.available | 2019-03-14T10:41:05Z | |
| dc.date.available | 2022-05-22T06:40:13Z | |
| dc.date.issued | 2017-09-01 | |
| dc.identifier.uri | http://localhost:8080/xmlui/handle/123456789/6861 | |
| dc.description | no of pages 128 , مساحة 18/2017 | |
| dc.description.abstract | The purpose of this project is redesigning the road, which connects Dura city with the tabaqa village. The advantage of this road is making the travelling to Dura villages (western lines) faster and the travelling to the village it self . in this project we will do the all surveying application, in addition to design the road ,geometric and structural design ,and to solve the problems of storm water, and regard safety regulations for Pedestrian and drivers and cars . | en_US |
| dc.language.iso | ar | en_US |
| dc.publisher | جامعة بوليتكنك فلسطين - كلية الهندسة - مساحة | en_US |
| dc.subject | الطرق - تأهيل | en_US |
| dc.title | اعادة تأهيل وتصميم طريق الطبقة | en_US |
| dc.type | Other | en_US |