DSpace Repository

Design ofMedium Voltage Distribution System between Beat-Aulla and Al-Dahiriya

Show simple item record

dc.contributor.advisor Maghalseh, Maher
dc.contributor.author Abu-Haltam, Mus’ab
dc.contributor.author Dayeh, Naseem
dc.contributor.author Abu-Zalatah, Wisam
dc.date.accessioned 2019-03-03T08:13:51Z
dc.date.accessioned 2022-05-22T06:39:30Z
dc.date.available 2019-03-03T08:13:51Z
dc.date.available 2022-05-22T06:39:30Z
dc.date.issued 2018-05-01
dc.identifier.uri http://localhost:8080/xmlui/handle/123456789/6829
dc.description Cd , no of pages 117 ,طاقة 3/2018 , in the store
dc.description.abstract هذا المشروع يقوم على عمل تصميم لخط توزيع كهربائي بجهد متوسط) 33 كيلو فولت (؛ ليربط ما بين بيت أولا والظاهرية؛ ليقوم بإيصال الكهرباء الى جميع المناطق التي في مسار هذا الخط،وهذا النظام يحتوي على عديد من الأجزاء مثل محطة التحويل وخط التوزيع والابراج وأنظمة الحماية وأنظمة المراقبة، وتم الاخذ بعين الاعتبار الزيادة في الاستهلاك الكهربائي، فتم القيام بعمل دراسة للاستهلاك الكهربائي خلال الفترة الواقعة ما بين (2017-2040). تم اعداد التصميم بناء على الاستهلاك الكهربائي لجميع المناطق حتى عام 2040 حيث ان الطاقة المسحوبة لهذا الخط تأتي من محطة تحويل كهربائية موجودة في بلدة بيت أولا بقدره كهربائية تصل الى)180 ميغا فولت أمبير (، خلال فترة المشروع. بالإضافة الى ذلك تم الاخذ بعين الاعتبار زيادة الطلب على مصادر الطاقة المتجددة خاصة أنظمة الخلايا الشمسية، فتم عمل دراسة لهذا الموضوع، خاصة بما يتعلق بموضوع كمية الطاقة التي نتوقع انتاجها من هذا النظام، ومن ثم تم ادخال هذه البيانات في النظام. بناء على هذه البيانات والدراسات وابحاث سابقة تم عمل هذا المشروع بجميع المعدات المطلوبة ومن ثم تم عمل محاكاة للنظام باستخدام برنامج ال ETAPومراقبة النظام وعمل الحلول له.  Abstract This project aims to design an electrical distribution system work of a medium voltage distribution line33 kilovolt (kV) to connect between Beat-Aulla and Al-Dahiriya, to connect the electricity to all the areas in the path of this line. The increase in electricity consumption has been taken into consideration. Then the studywas constructed for the consumption of electricity during the period between (2017-2040), and the line was designed according to the electric consumption of all regions until 2040. As the power drawn to this line comes from an electrical substation located inBeat-Aulla town with an electrical capacity will reach to 180 mega volt ampere (MVA) during the project period. In addition, the increase in the demand for renewable energy sources, especially solar cell systems, has be taken into consideration, especially in the quantity of energy that was expectedto produce from this system. Based on these data, studies and previous research, this project was done with all the required equipment and then a simulation of the system was done using the ETAP (Electrical Transmission Analysis program) program, system monitoring and solutions work en_US
dc.language.iso en en_US
dc.publisher جامعة بوليتكنك فلسطين - هندسة طاقة en_US
dc.subject Voltage Distribution System en_US
dc.title Design ofMedium Voltage Distribution System between Beat-Aulla and Al-Dahiriya en_US
dc.type Other en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account