Abstract:
This project is studying of the medium voltage electric power network
of Hebron city by using the Power World Simulator (Simulator) program and
making the essential developments and improvements on the network such as
reducing the losses, improving the Power Factor, achieving the network stability
and increasing its efficiency.
The core of the project is the using of the Power World Simulator program
which has the simulation property, which allows us to analyze and study the status of
the network more accurately.
After making the studying to the network, we found that it suffers from many
problems such as high losses 16%, Power Factor less than 0.92, voltage drop, overloaded conductors and transformers.
To solve the previous problems we performed five developing scenarios,
which are re-conductoring, voltage upgrading, power factor correction, adding new
substation and over loaded transformers rehabilation.