Abstract:
After we finished the idea of the machine, we start to buy the metal and all
materials that needed for project. The first work is turning the iron places, roll boxes
and its columns, after that we start to do the bodywork of the machine, the cone and
the screw. Then accumulating all parts on the body. At the finishing of mechanical
stage we Calibrate all part of all operations.
Then we drift to electrical stage, at this stage we assembly the electrical board
with all components, and programming the PLC controller to control all operations.
After that we examine and calibrate steps with final works. All stages of machine
work probably; from pulling the roll, filling and ironing stage.