DSpace Repository

Design and cost estimation of water supply drainage system , air conditioning system and treatment system of solid and waste water for 1049.07 m2 for villa in Dura

Show simple item record

dc.contributor.advisor Sider, Ishaq
dc.contributor.author Shawabkeh, Diya
dc.contributor.author Jaber, Mohammad
dc.contributor.author Harahsheh, Mohammad
dc.date.accessioned 2018-12-02T09:05:04Z
dc.date.accessioned 2022-05-19T11:16:55Z
dc.date.available 2018-12-02T09:05:04Z
dc.date.available 2022-05-19T11:16:55Z
dc.date.issued 2014-12-01
dc.identifier.uri http://localhost:8080/xmlui/handle/123456789/6359
dc.description CD , no of pages 103, 27281, ميكانيك 8/2014 ,in the store
dc.description.abstract Using supply system is provide the building for potable water by pumping it from well to the different fixtures throw tubes called risers and using boilers to heat the water In drainage system which help the building to dispose the waste and sold water and by using water treatment in order to use gray water for flushing and irrigation. For every store we will use different system: Under floor heating system is a winter heating method that is considered are a part of what is known as panel heating , the heated panel in this case is part of the space floor to be heated . Air conditioning system implies much more than the central of the inside temperature of a given space It implies the controlling and maintaining of the following four atmospheric can that effect the human comfort 1. Temperature of the space 2. Humidity or the moisture contents of the air 3. Purity and quality of the inside air 4. Air velocity and air circulation within the space Satisfy the human comfort we will provide the inner rooms by split units The hot water heating system consist of the boiler or the solar panels system and the system of pipes connected to radiators , piping located in rooms to be heated . So to make the estimation will be done for the system after design and it`s drawings on the real drawings to make the specifications dimensions and quantities for all mechanical parts used in this villa This project is done as an applies for several engineering courses which has been studies in our Specialization . en_US
dc.language.iso en en_US
dc.publisher جامعة بوليتكنك فلسطين - كلية الهندسة - ميكانيك en_US
dc.subject estimation of water supply drainage system en_US
dc.subject air conditioning system en_US
dc.subject treatment system of solid en_US
dc.subject waste water en_US
dc.title Design and cost estimation of water supply drainage system , air conditioning system and treatment system of solid and waste water for 1049.07 m2 for villa in Dura en_US
dc.type Other en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account