dc.contributor.advisor |
Shabaneh, Islam |
|
dc.contributor.author |
Saied, Ali |
|
dc.contributor.author |
Rubaa, Belal |
|
dc.contributor.author |
Al-Absi, Huthiefa |
|
dc.contributor.author |
Abu-Hamdiay, Mohammed |
|
dc.date.accessioned |
2018-05-20T12:45:12Z |
|
dc.date.accessioned |
2022-05-19T10:44:09Z |
|
dc.date.available |
2018-05-20T12:45:12Z |
|
dc.date.available |
2022-05-19T10:44:09Z |
|
dc.date.issued |
2015-05-31 |
|
dc.identifier.uri |
http://localhost:8080/xmlui/handle/123456789/6059 |
|
dc.description |
CD , 29358 , no of pages 147 , ميكانيك 14/2015, in the store |
|
dc.description.abstract |
This project deals with the design of mechanical systems for Palestine Polytechnic University hospital , which consists of Nine stories with a total area of 20774 (m2).
So that the hospital serves more than (100) thousand people of Hebron city and villages near.
Mechanical systems include heating, ventilation and air conditioning, Water
supply, Drainage system, Fire fighting and Medical Gases.
This project discuses briefly theory needed for the design of mechanical systems.
Design output is then displaced on drawings. These drawings will include: piping networks for water distribution, drain and sewage and medical gas system. Also drawing will detail duct systems and different equipment required for the hospital. |
en_US |
dc.language.iso |
en |
en_US |
dc.publisher |
جامعة بوليتكنك فلسطين , كلية الهندسة , ميكانيك |
|
dc.relation.ispartofseries |
29358;147 |
|
dc.subject |
mechanical systems,hospital,Polytechnic University,heating, ventilation,air conditioning, Water supply, Drainage system, Fire fighting,Medical Gases. |
en_US |
dc.title |
Design and Documentation of the Mechanical System for Palestine Polytechnic University Hospital |
en_US |
dc.type |
Other |
en_US |